TT-GISC Work Package Overview and Status Report

                          TT-GISC Work Package Overview and Status Report

                   Updated: 13 October 2021

 

Work Package

Issues

Outcome/Deliverables

Tasks/Actions

Status Report

WP-1 

Cache completeness 

  • All GISC cache shall have all global exchange dataset (common holdings), however, the caches have not been synced 
  • Definition of “completeness” 

  • Cache monitoring 

     

  • Develop procedure, how to measure the Cache data, and to check if it’s completed or not-completed 
WP-1-Status Report

WP-2 

WIS Monitoring 

  • JSON specification looks out of date 

  • GIS watch guide should include metadata monitoring

  • Updated GISC Watch Guide (procedure) 

  • Updated JSON specification 

  • Develop a JSON to monitor sync status of caches 

     
WP-2-Status Report

WP-3 

Capacity development 

  • Some GISCs have not provided training opportunity for its AoR 

  • Need standard training materials 

  • Standard training materials for WIS2.0 
   

WP-4 

GISC committee 

  • GISC report template looks out of date 
  • Updated GISC report template 

     
  • Define is GISC report items to be reported to ET-OM  
 

WP-5 

Possible VolC1 replacement

  • WIS catalogue should by now have replaced VolC1 

  • Status unclear  

  • Produce VolC1 based on WIS catalogue? 

  • Produce METNOs as before?  

  • Look into requirements of VolC1 
    -- delta notification mechanism?