RA II WG-S Expert Team on Urban Services (ET-US)
About us
Note: The experts listed below served during the RA II-17 Intersessional Period (2021-2024). This list will be updated following decisions by the Working Group and Management Group.
Reference Document
Members
Documents and Publications
Related News
No related news found.
Related Meetings
No related meetings found.
Terms of Reference
(i) Lead the Demonstration Project (DP)
• RA II-17-S-DP-2: Advance Integrated Urban Services
(ii) Support WG Services identifying regional requirements and needs on Urban meteorology Services;
(iii) Develop the Implementation Plan for the Integrated Urban Services at regional level;
(iv) Facilitate the linkage with Hydrology and DRR groups for Urban Flood alerts.
(vi) Collaborate with Study Group on Integrated Urban Services of SERCOM.
• RA II-17-S-DP-2: Advance Integrated Urban Services
(ii) Support WG Services identifying regional requirements and needs on Urban meteorology Services;
(iii) Develop the Implementation Plan for the Integrated Urban Services at regional level;
(iv) Facilitate the linkage with Hydrology and DRR groups for Urban Flood alerts.
(vi) Collaborate with Study Group on Integrated Urban Services of SERCOM.
Related Groups
There are no results.