GSICS-EP-10
GLOBAL SPACE-BASED INTER-CALIBRATION SYSTEM |
|
10th SESSION OF THE EXECUTIVE PANEL | |
Date: | 6 to 8 June 2011. Start of the meeting: Monday 6 June, 10 am |
WMO, Geneva, Room: 8 JURA (8th Floor) | |
Directions and Hotel information | |
Final Report: | Published here : Final meeting reports (as soon as available) |
Agenda Item | Related Working Documents and Background Information |
---|---|
1 1.1 1.2 |
OPENING OF THE SESSION
|
2 | REVIEW OF OUTSTANDING ACTIONS FROM PREVIOUS EP MEETINGS Status of actions (draft as of 13 May) |
3 |
REPORTS FROM GPRCs AND OTHER GSICS MEMBERS 3.6 (1) JAXA (GCOM Calibration plans) 3.6 (2) JAXA (GOSAT-IASI intercalibration) |
4 | REPORT FROM GCC (GPPA activities, implementation of the baseline algorithm, instrument event log, other GCC issues) 4. GSICS Coordination Centre Update (F. Weng, R. Iacovazzi) |
5 |
GRWG REPORT ON CURRENT AND PLANNED SCIENTIFIC ACTIVITIES (Discussion on baseline algorithm, IASI/AIRS traceability, CLARREO and TRUTHSwith relevance to GSICS, Instruments events logs, draft Guide on Uncertainty, other GRWG issues) 5.1 Baseline algorithm concept (T. Hewison) 5.2/5.3 Traceability (T. Hewison) 5.5 Uncertainty analysis (T. Hewison) 5.6 Combining multiple references (T. Hewison) Note: The final report of the joint GRWG-GDWG meeting is in the background documents below |
6 |
GDWG REPORT ON DATA MANAGEMENT ISSUES 6. GDWG presentation (A. Jelenak) Note: The final report of the joint GRWG-GDWG meeting is in the background documents below |
7 |
GSICS USER INTERACTIONS (Outcome of 2nd user workshop, SCOPE-CM statement of needs, user registration issues, code sharing with users, Terms of Use for products) 7.2 SCOPE-CM Statement of needs. Version 1.0 (SCOPE-CM Secretariat) 7.3 User registration and messaging system (A. Jelenak, L. Brown, R. Iacovazzi) |
8 |
GSICS PARTNERSHIPS (Coordination with CEOS WGCV IVOS, GRUAN, GPM X-Cal) Partnerships(T. Hewison) |
9 |
GSICS OUTREACH (GSICS Quarterly, Users' Workshop 2011 and beyond, special issue of Journal, fact sheet) |
10 | GSICS OPERATIONs PLAN FOR 2011/2012 GSICS Operations Plan 2011/2012 (updated 2011-04-17) (R. Iacovazzi) |
11 | GSICS IN THE FUTURE CGMS AND GOS BASELINE 11. GSICS in the future CGMS and GOS baseline (J. Lafeuille) |
12 | INTERNAL MATTERS (Format of future joint WG meetings, Documentation Plan, members' representation in GDWG and GRWG, evolution of GSICS membership, status of teleconferences) |
13 | ANY OTHER BUSINESS 13-Contribution to the CIMO Guide (J. Lafeuille) |
14 | SUMMARY OF DECISIONS AND ACTIONS |
15 | DATE AND PLACE OF NEXT MEETINGS |
General Background Documents/ Information | |
Final Report of the 9th GSICS Executive Panel | |
Final Report of the GRWG-GDWG Joint Meeting, Daejeon, Rep. Korea, 22-25 March 2011 | |
Introduction to GRUAN | |
Members of the GSICS Executive Panel and Working Groups | |
Terms of Reference of the Executive Panel | |
Terms of Reference of the GDWG | |
Terms of Reference of the GRWG |