SEMDP Kick-off Workshop
Space-based Weather and Climate Extremes Monitoring (SWCEM) Demonstration Project (SEMDP) Workshop
and
A Preparatory Meeting for SEMDP in East Asia and Western Pacific Regional Subproject Steering Group (SG-SEMDP)
Date: 19-22 March 2018, Registration: 08:00-08:15am, Start of the meeting: 08:30am
Venue: Badan Meteorologi, Klimatologi, dan Geofisika (BMKG) Head Office Campus, Jakarta, Indonesia (Meeting Room 1.A (1st Floor, Building-A (Main BMKG Office HQ Building))
Online registration for the meeting: register here
Accommodation of the hotel, Visa application: download info package form here
Document template is available (presentation, abstract)
Digest of the Meeting (movie file: 215MB)
SEMDP Workshop
Date: 19-21 March 2018, Start of the meeting: 08:30am
Venue: Badan Meteorologi, Klimatologi, dan Geofisika (BMKG) Head Office Campus, Jakarta, Indonesia (Meeting Room 1.A (1st Floor, Building-A (Main BMKG Office HQ Building))
Agenda Item |
AGENDA ITEMS |
Doc. N° |
Submitted by |
1 |
OPENING OF THE MEETING |
|
Chair |
1.1 |
Welcome Session presented by Local Organizer and WMO |
BMKG WMO RA-V WMO Secretariat |
|
1.2 |
Introduction of Participants (Provisional list of Participants) |
|
all
|
1.3 |
Adoption of Agenda (Provisional Agenda) |
Chair |
|
1.4 |
Working Arrangements |
WMO Secretariat Local Secretariat |
|
2 |
Overview of SEMDP |
Chair |
|
2.1 |
Overview of the project |
WMO Secretariat (OBS) (Toshiyuki Kurino) |
|
2.2 |
WMO's related projects for Climate Extremes Monitoring |
(abstract) |
WMO Secretariat (CLW) (Omar Baddour) |
2.3 |
Enhancing Capacity of Pacific Countries in Multi Hazard Early Warning |
ESCAP BMKG (Riris Adriyanto) |
|
3 |
Current Status of Research Works and Satellite Programs for SEMDP |
|
Chair |
3.1
|
Current Status of Research Works for SEMDP
|
||
3.1.1 |
WCRP/Grand Challenges-Extremes |
(abstract) |
WCRP (ETCCDI) (Lisa Alexander) |
3.2 |
Current Status of Satellite Programs for SEMDP |
||
3.2.1 |
JAXA's GSMaP Overview |
JAXA (Takuji Kubota) |
|
3.2.2 |
CMA Satellite Programs for Supporting SEMDP |
(abstract) |
CMA/NSMC (Yang JUN) |
3.2.3
|
Satellite Based Monitoring of Extreme Weather and Climate at NOAA/NWS/CPC and NOAA/NESDIS/STAR: Products and Applications |
NOAA/NWS/CPC (Pingping Xie) |
|
4 |
Current Status of Climate Extremes Monitoring and Needs for the Satellite Products from RCCs and NMHSs |
||
4.1 |
WMO RCCs |
|
Chair |
4.1.1 |
RA-II/RCC Beijing
|
CMA (Xiaolong Jia) |
|
4.1.2 |
RA-V/SEARCC-Network/Indonesia |
(abstract1) (abstract2) |
BMKG (Ardhasena Sopaheluwakan ) |
4.1.3 |
RA-V/SEARCC-Network/ Philippines |
PAGASA (Edna L. Juanillo) |
|
4.1.4
|
RA-V/SEARCC-Network/Singapore
|
MSS/CCRS (Raizan Rahmat) |
|
4.1.5 |
RA-IV/USRCC (presentation slides and abstract are included in the presentation in agenda 3.2.3) |
4.1.5 (abstract) |
NOAA/NWS/CPC (Pingping Xie) |
4.2 |
WMO NMHSs |
|
Chair |
4.2.1 |
RA-II/Vietnam |
Southern Regional Hydro-Meteorological Center, NHMS of Viet Nam (Le Thi Bich Ngoc) |
|
4.2.2
|
RA-V/Australia
|
AuBoM (Yuriy Kuleshov) |
|
5 |
Discussion on Implementation of the cascading framework for SEMDP |
|
Chair WMO Secretariat |
5.1 |
Introduction to the draft SEMDP Implementation Plan |
|
|
5.2 |
Components and format of the product suites |
|
|
5.3 |
Structure and responsibility of the RCCs for SEMDP |
|
|
5.4 |
NMHS involvements for SEMDP |
|
|
6 |
Summary of the Discussion |
|
Chair WMO Secretariat |
6.1 |
Each topics Summary |
|
|
6.2 |
Overall summary |
|
|
6.3 |
Updating the draft SEMDP Implementation Plan |
|
|
7 |
Concluding of the workshop |
|
Chair WMO Secretariat |
7.1 |
Endorsement of the Implementation plan |
|
|
7.2 |
Summary of the workshop |
|
|
7.3 |
Extraction of Workshop Recommendations and approval |
|
|
8 |
Establishment of the SEMDP in East Asia and Western Pacific Regional Subproject Steering Group (SG-SEMDP) |
|
Chair WMO Secretariat |
8.1 |
Terms of Reference for the Steering Group |
|
|
8.2 |
Membership of the Steering Group |
|
|
9 |
CLOSING |
|
Chair |
SEMDP in East Asia and Western Pacific Regional Subproject Steering Group (SG-SEMDP)
Preparatory Meeting
Date: 22 March 2018, Start of the meeting: 8:30am
Venue: Badan Meteorologi, Klimatologi, dan Geofisika (BMKG) Head Office Campus, Jakarta, Indonesia (Meeting Room 1.A (1st Floor, Building-A (Main BMKG Office HQ Building))
1 |
Overview of the Steering Group responsibility and membership |
Chair WMO Secretariat |
|
2 |
Key issues for steering SEMDP in East Asia and Western Pacific Region |
|
Chair WMO Secretariat |
3 |
Key issues of science and technology to be developed |
|
Chair WMO Secretariat |
4 |
Key issues of implementation/applications |
|
Chair WMO Secretariat |
5 |
Summary |
|
Chair WMO Secretariat |
6 |
Closing |
Chair |
General Background Documents/ Information
- Final Report of the SWCEM Workshop, Geneva, 15-17, February 2017