Commission for Basic Systems / Commission for Aeronautical Meteorology |
Inter-programme Coordination Team on Space Weather Fifth Meeting (ICTSW-6) |
Date and time: |
9 to 11 November 2016; Start of the meeting: 09:30 |
Venue: |
WMO HQ, Geneva |
|
Final Report: |
Will be published here : Final meeting reports (after the meeting, as soon as available ) |
All PDF documents in a compressed (zip) folder: ICTSW-5 docs (as of 21 November)
Agenda Item |
Related Working Documents and Background Information |
---|
1
|
Opening 1.1 Welcome and introduction of participants Doc.1.1 Draft agenda
1.3 Practical arrangements: Tentative meeting schedule (rev.1) |
2 |
Co-chairs' report Doc.2: Co-chairs' report |
3 |
Outcome of relevant WMO, ITU and related meetings
3.1. WMO: EC-66, CIMO, CAeM, CBS-Ext(14), CGMS
Doc.3.1(1): Outcome of WMO meetings with relevance to space weather Rev.1 Doc.3.1(2): Ionosphere-atmosphere coordination workshop Doc.3.1(3): Outcome of CGMS-42 with relevance to space weather
3.2. ITU activities related to space weather: ITU presentation (V. Nozdrin)
Background information: Doc.3.2: ITU discussions on space weather matters Radio-frequency spectrum for space weather activities (submitted to SG-RFC,March 2014)
|
4 |
Four-year plan for WMO space weather activities Doc.4(1): Four-year plan for WMO space weather activities
Attachment to Doc.4(1) Rev.1 (This is the main document!) Doc.4(2): Outstanding actions and recommendations from previous meetings |
5 |
Evolution of space weather observations 5.1. Rolling Review of Requirements (RRR) process
5.2. Observation requirements database (OSCAR/Requirements)
5.3. Observation requirements for space weather
5.4. Gound-based observing capabilities: Doc.5.4: Geomagnetic observatories (L. Trichtchenko)
5.5. Space-based observing capabilities: Doc.5.5: OSCAR/space (J.Lafeuille) Doc.5.6. Statement of Guidance for future space weather observation (Draft update)
|
6 |
Data and product exchange in the context of the WMO Information System (WIS) Doc. 6.1: Activity report of the WIS Pilot Project Doc.6.2: ITU discussions on ionospheric products and formats |
7 |
Operational space weather products and training 7.1. Space Weather Product Portal
7.2. Guidelines for regional geomagnetic disturbance products
7.3.
New candidate products: Doc.7.3: Products proposed by the KSWFC (K. Yoon)
7.4. Training material for the portal:oc.7.4: NOAA training material
7.5 Training strategy |
8 |
Extreme space weather event warning |
9 |
ICTSW-ISES collaboration Doc.9: Draft exchange of letters between WMO and ISES |
10 |
Any other business - Presentations on JRC activities in space weather GNSS ionospheric activities in JRC/Ispra Prototyping a low-cost ionospheric scintillation monitoring receiver The impact of space weather on power grids Impact of an extreme space weather event on European space assets
|
11 |
Conclusion of the meeting |
General Background Information |
---|
|
Template for ICTSW-5 documents |
|
ICTSW Membership (Updated in October 2014) |
|
Final report of the fourth ICTSW meeting (Geneva, Nov. 2013) |
|
Final report of the third ICTSW meeting (Brussels, Nov. 2012) |
|
Final report of the second ICTSW meeting (Namur, Dec. 2011) |
|
Final report of the first ICTSW meeting (Boulder, Apr. 2011) |