2015
Jie Tang, David Byrne, Jun A. Zhang, Yuan Wang (corresponding author), Xiao-tu Lei, Dan Wu, Ping-zhi Fang, and Bing-ke Zhao (2015): Horizontal Transition of Turbulent Cascade in the Near-Surface Layer of Tropical Cyclones. J. Atmos. Sci., 72, 4915–4925.
Li, X., J. Ming, M. Xue, Yuan Wang (corresponding author) and K. Zhao (2015), Implementation of a dynamic equation constraint based on the steady state momentum equations within the WRF hybrid ensemble-3DVar data assimilation system and test with radar T-TREC wind assimilation for tropical Cyclone Chanthu (2010), J. Geophys. Res. Atmos., 120, 4017–4039, doi:10.1002/2014JD022706.
Jinfeng Ding, Xiao-Yong Zhuge, Yuan Wang (corresponding author), and Anyuan Xiong, (2015): Evaluation of Chinese Aircraft Meteorological Data Relay (AMDAR) Weather Reports. J. Atmos. Oceanic Technol., 32, 982–992. doi: http://dx.doi.org/10.1175/JTECH-D-14-00145.1
Zhuge, X. Y., Guan, J., Yu, F., and Wang Yuan (corresponding author), (2015) A New Satellite-Based Indicator for Estimation of the Western North Pacific Tropical Cyclone Current Intensity. IEEE TRANSACTIONS ON GEOSCIENCE AND REMOTE SENSING, 53, 5661-5676. (Cover Story)
Xiao-Yong Zhuge, Jie Ming and Yuan Wang(corresponding author) (2015): Reassessing the Use of Inner-Core Hot Towers to Predict Tropical Cyclone Rapid Intensification. Wea. Forecasting, 30, 1265–1279.
Xin Xu, Ming Xue, and Yuan Wang, (2015): Mesovortices within the 8 May 2009 Bow Echo over the Central United States: Analyses of the Characteristics and Evolution Based on Doppler Radar Observations and a High-Resolution Model Simulation. Mon. Wea. Rev., 143, 2266–2290. doi: http://dx.doi.org/10.1175/MWR-D-14-00234.1
Xin Xu, Ming Xue, and Yuan Wang (2015): The Genesis of Mesovortices within a Real-Data Simulation of a Bow Echo System. J. Atmos. Sci., 72, 1963–1986.
Kun Zhao Qing Lin, Wen-Chau Lee, Y. Qiang and Fuqing Zhang , (2015): Doppler radar Analysis of Triple Eyewalls in Typhoon Usagi, Bulletin of the American Meteorological Society. doi: http://dx.doi.org/10.1175/BAMS-D-15-00029.1.
Mingjun Wang, Ming Xue, Kun Zhao (2015): The Impact of T-TREC-retrieved Wind and Radial Velocity Data Assimilation using EnKF and Effects of Assimilation Window on the Analysis and Prediction of Typhoon Jangmi (2008) ,J. Geophys. Res. Atmos.,DOI: 10.1002/2015JD024001.
Chen X.M., Y. Q.Wang, Kun Zhao, (2015): Synoptic Flow Patterns and Large-Scale Characteristics Associated with Rapidly Intensifying Tropical Cyclones in the South China Sea,Monthly Weather Review,143(1),64-68
Xiaowen Tang, Wen-Chau Lee, and Yuan Wang (corresponding author) (2015): Nonlinear Wind Analysis of Single-Doppler Radar Observations within a DVAD Framework. J. Appl. Meteor. Climatol., 54, 1538–1555
Ming, J., and J. A. Zhang, (2015): Effects of surface flux parameterization on the numerically simulated intensity and structure of Typhoon Morakot (2009). Adv. Atmos. Sci., 33(1), 58–72, doi: 10.1007/s00376-015-4202-z.
Shoujuan Shu and Fuqing Zhang, (2015): Influence of Equatorial Waves on the Genesis of Super Typhoon Haiyan (2013). J. Atmos. Sci., 72, 4591–4613. doi: http://dx.doi.org/10.1175/JAS-D-15-0016.1
Yuan, H., M. Sun, and Y. Wang, (2015): Assessment of the Benefits of the Chinese Public Weather Service. Meteorological Applications. DOI: 10.1002/met.1539.
Chen, X.-C., K. Zhao, M. Xue, B. Zhou, and W. Xu,( 2015 ): Radar observed diurnal cycle and propagation of convection over the Pearl River Delta during Mei-Yu season. J. Geophy. Res., 120, 12557-12575
2016
Wen, L., K. Zhao, G. Zhang, M. Xue, B. Zhou, S. Liu, and X. Chen,(2016): Statistical characteristics of raindrop size distributions observed in east China during the Asian summer monsoon season from the 2D-video disdrometer and micro-rain radar. J. Geophy. Res., 121, 2265–2282。
Zhuge, X., and X. Zou (2016): Test of a Modified Infrared Only ABI Cloud Mask Algorithm for AHI Radiance Observations. J. Appl. Meteor. Climatol. doi:10.1175/JAMC-D-16-0254.1,
Ming J., and J. A. Zhang(2016) : Effects of surface flux parameterization on numerically simulated intensity and structure of Typhoon Morakot (2009). Advances in Atmospheric Sciences, 33(1), 58-72。
Chen, (2016): Statistical characteristics of raindrop size distributions observed in east China during the Asian summer monsoon season from the 2D-video disdrometer and micro-rain radar. J. Geophy. Res., 121, 2265–2282.
Wen, L., K. Zhao, G. Zhang, M. Xue, B. Zhou, S. Liu, and X. Chen,(2016): Statistical characteristics of raindrop size distributions observed in east China during the Asian summer monsoon season from the 2D-video disdrometer and micro-rain radar. J. Geophy. Res., 121, 2265–2282。
Zhuge, X., and X. Zou (2016): Test of a Modified Infrared Only ABI Cloud Mask Algorithm for AHI Radiance Observations. J. Appl. Meteor. Climatol. doi:10.1175/JAMC-D-16-0254.1,
Ming J., and J. A. Zhang(2016) : Effects of surface flux parameterization on numerically simulated intensity and structure of Typhoon Morakot (2009). Advances in Atmospheric Sciences, 33(1), 58-72。
Chen, (2016): Statistical characteristics of raindrop size distributions observed in east China during the Asian summer monsoon season from the 2D-video disdrometer and micro-rain radar. J. Geophy. Res., 121, 2265–2282.
Zou,X., X. Zhuge, and F. Weng (2016): Characterization of Bias of Advanced Himawari Imager Infrared Observations from NWP Background Simulations Using CRTM and RTTOV. J. Atmos. Oceanic Technol. doi:10.1175/JTECH-D-16-0105.1, in press.
Wang, M., M. Xue*, and K. Zhao,(2016): Impact of inner-core structures obtained through radar data assimilation on the track forecasting of typhoon Jangmi (2008) near Taiwan Island. J. Geophy. Res., Accepted.
Wang, M., K. Zhao, M. Xue, G. Zhang, S. Liu, L. Wen, and G. Chen,(2016): Precipitation Microphysics Characteristics of a Typhoon Matmo (2014) Rainband after Landfall over Eastern China based on Polarimetric Radar Observations. J. Geophy. Res., Accepted.
Zhao, K., M. Wang;, M. Xue, P. Fu, Z. Yang, Y. Zhang, W.-C. Lee, F. Zhang, Q. Lin, and Z. Li, 2016: Doppler radar analysis of a tornadic miniature supercell during the Landfall of Typhoon Mujigae (2015) in South China. Bull. Amer. Meteor. Soc., Accepted with minor revision.
Xu, X., J. Song, and Y. Wang (2016) : Quantifying the effect of horizontal propagation of three-dimensional mountain waves on the wave momentum flux using Gaussian beam approximation. J. Atmos. Sci., Under review.
Xu, X., Y. Wang, M. Xue, and H. Huang, 2016: Mechanisms of secondary convection within a mei-yu frontal mesoscale convective system in Eastern China. J. Geophys. Res. Atmos., Under review.
Zhuge, X., and X. Zou (2016): Impacts of Infrared Land Surface Emissivity Models on Simulations of AHI Surface-Sensitive Channels over Different Surface Types. JGR-Atmosphere, under review.
|