Required action by Members to prepare for the initial composition of GBON
Members are requested to undertake the following actions to establish the initial composition of GBON:
- Final designation of existing observing stations to be included in GBON (see description of the initial seeding process below). To facilitate this process, on 8 September 2022 the stations identified by TT-GBON for initial seeding will be assigned to GBON in OSCAR/Surface with “Pending Approval” status. If the WMO Member wishes to object to the designation of any of these stations in GBON, the National Focal Point for OSCAR/Surface (NFP) may remove assignment of such stations from GBON in OSCAR/Surface (see points 4 and 5 below). No action by the NFP before 15 November 2022 will be understood as concurrence of the Permanent Representative concerning the designation of such stations in GBON.
- Conduct a national gap analysis against GBON requirements (see guidelines and template referred in the list of referred material below). To facilitate this process, a global gap analysis has been conducted which estimates the number of improved and new land surface and land upper-air stations to be filled by WMO Members; the results from this gap analysis for Members territory are provided in Annex 4 to WMO Circular No. 18876/2022/I/WIGOS/ONM/GBON.
- Set national targets for GBON and develop a national GBON contribution plan (see references to guidelines and template in the list of referred material below).
- Ensure that a national focal point for OSCAR/Surface is nominated and has the authority to designate GBON stations (see the list of designated national focal points).
- Designate additional stations to be committed to GBON by NFP using the OSCAR/Surface database interface. All designated stations will appear on the dedicated webtool.