Aircraft-Based Observations Work Program

Planning Basis for Global Development of the Aircraft-based Observing System

The work of the Aircraft-Based Observations Program for development of the aircraft-based observing system and the AMDAR system, is primarily based on two planning documents:

  1. The High-level Guidance on the Evolution of Global Observing Systems during 2023–2027 in Response to the Vision for the WMO Integrated Global Observing System in 2040 (WMO-No. 1334); and,
  2. The medium-term planning as described in detail in the Global Framework for the WMO Aircraft-based Observations (ABO) Programme (2027–2031)

ABOS Strategy & Implementation Plan (superseded -replaced by the ABO Global Framework)

Work Program of the INFCOM, ET-ABO

The achievement of the Global Framework for the WMO ABO Programme 2027-2031 will be undertaken primarily through the work and guidance of the Expert Team on Aircraft-Based Observing systems (JET-ABO) under the joint management of the Standing Committees on Earth Observing Systems and Monitoring Networks (SC-ON) and Measurements, Instrumentation and Traceability (SC-MINT) both under INFCOM.

The focus of ET-ABO will be the following elements:

  • AMDAR Program expansion and capacity building - especially over data-sparse areas
  • Aircraft-based observing system development and aircraft-based observations derivation
  • Aircraft-based observations international data and data quality management
  • Training and Outreach
  • Scientific and technical specification, development and validation
  • Standardisation
  • Inter-comparison
  • Aviation systems integration

The latest work plan for ET-ABO is available here: SC-ON_ET-ABO_WorkPlan_2027-2028_v1.0_Nov2026

Major expenditures during 2024–2026

With the support of WMO Members' contributions to the former AMDAR Trust Fund (ABO Award), the following activities were carried out:

  • ABO Metadata Repository: development of the repository (2024–2025).
  • AMDAR data over data sparse areas -RA I (Africa) and RA III (South America)-: data collection through an agreement with the E-ABO Programme (EUMETNET/MetOffice). Data available at WIS using header IUAA2ii EGRR.
  • AMDAR Onboard Software in Africa: installation of the AMDAR Onboard Software (AOS) on five Kenya Airways B737 aircrafts (2025). Data available at WIS using the header IUAH01 HKNC.
  • WMO Regional Workshop on ABO for the Americas: organization and travel costs for the in-person workshop in Panama (December 2024).
  • Global Aviation Stakeholders on ABO Meeting and ET-ABO Meeting: organization and travel costs for the in-person meetings (September 2025).
  • WMO UAS Demonstration Campaign: consultancy cost for the preliminary and final reports.

Budget for the ABO Work Program

The Budget for the ABOP is based on the Work Plans of the JET-ABO that contribute to the development and management of the program and is supported by the AMDAR Trust Fund under its Terms of Reference.


Updated: 24 November 2026

Last updated: 24 November 2026